bid date & time:  June 20, 2019 2:00 PM (PDT)
summary:  The Central Marina Improvements Phase 4 project will demolish the existing PORT-owned boathouses and floats that make up central G-Dock, reconstruct G-Dock with new concrete floats, relocate existing private boathouses to the new G-Dock and existing I-Dock, and dredge the area between Central F-Dock and H-Dock and within the South Marina near seiner wharf. Work included under this contract includes demolition of floating structures, extracting and disposing of creosote-treated piles, dredging and deep-water disposal, fabricating and installing new concrete floating docks, furnishing and installing galvanized steel pipe piles, float utility systems, relocating and securing existing private boathouses, and any and all other work necessary for a complete and serviceable facility.
consultant:
engineer's estimate:  $3,200,000.00 - $3,800,000.00

DOCUMENTS

ANNOUNCEMENTS

Posted Project Announcements
No announcements have been posted.
May 16, 2019
Thank you for your interest in the Central Marina Improvements Phase 4 Project. The bid documents will be posted later today. Enjoy your day!
0
June 17, 2019
Please note, bids are now due Thursday, June 20, 2019 at 2:00 PM.
0
June 21, 2019
Please note a revised Bid Tab has been posted. The previous Bid Tab included an error with the engineer’s estimate.
0

RFI BOARD

Posted Posted Question
No RFI responses have been posted.
1.
Q: Is there a more defined pile schedule for both the 12 3/4" and 18" piles in reference to each dock noted in the drawing sections? Also, please confirm the wall thicknesses of both piles.
May 20, 2019
A: The locations of both size piling are shown on sheet C2.0 and C2.1. All piles shall be 1/2-inch wall thickness. This will be formalized in an upcoming addendum.
0

2.
Q: The existing junction box TB-B is a12" x 12" x 6" PVC box. Please confirm that junction box TB-B is large enough to splice 2- 4 conductor 3/0 cables plus 10 - 3/0 single conductors.
June 11, 2019
A: Junction box ‘TB-B’ is a new N4X junction box with waterproof terminals. Match size and type of existing N4X junction box below approach pier. Mount TB-B adjacent to, and aligned with, existing N4X box.
0

3.
Q: According to sheet E1.0, we are removing a 400 amp 2 pole breaker and adding a 400 amp 3 pole GFI breaker. 1. The existing breaker feeding G dock is a 200 amp breaker not 400 amp. 2. Please confirm there is room in DP-2 to add a 400 amp breaker 3. A remote trip unit to detect a ground fault has been added to DP-2, so is a GFI breaker required.
June 11, 2019
A: Records indicate that space exists in panel DP-2 for the addition of specified circuit breaker. Circuit breakers in Panel DP-2 are not equipped with ground fault protection.
0

4.
Q: Is there a Buy America domestic requirement for this project?
June 13, 2019
A: No; there is no federal funding on this project.
0

5.
Q: Section 03 34 00 2.2 B States Inner core of float shall be closed cell foam with water absorption of less than 2 percent by volume. Will it be acceptable to change the specification to 4% max absorption? Typical EPS virgin foam can test at about 2.6% max absorption. Typical float calculations are based on and take into account the 4% max absorption typically seen in the industry for one pound per cubic foot EPS.
June 14, 2019
A: Thank you for your input, please see Addendum No. 2.
0

6.
Q: ?1.4.C.4 specifies that the lateral load shall not be less than 480 plf. Please confirm that this is a factored load.
June 14, 2019
A: Please see Addendum No. 2.
0

7.
Q: Please confirm that the pile design is prescriptive
June 14, 2019
A: Please see Addendum No. 2.
0

8.
Q: To further clarify and define premature cracking and spalling of concrete surfaces under DIVISION 03 CONCRETE 3.10B will the Port please exclude from the coverage for premature cracking and spalling of concrete surfaces (i) bottom and side wall cracks that are less than or equal to .03 inches in width and 60 inches in length (ii) cracks which propagate from the side of the float and into the deck that are less than or equal to .02 inches in width, and (iii) deck cracks that are less than or equal to .02 inches in width and 60 inches in length.
June 14, 2019
A: Thank you for your input, please see Addendum No. 2.
0

9.
Q: Under DIVISION 3 CONCRETE, there are two warranty periods required pertaining to the concrete float system. One warranty requirement is 1.11A and the other is 3.10A. If this was the Port’s intention, would the Port please clarify the differences between these two warranty requirements?
June 14, 2019
A: Please see Addendum No. 2.
0

10.
Q: DIVISION 3 CONCRETE 1.11A’s warranty includes “a disruption of the claims procedure”. Would the Port please clarify what this requirement is?
June 14, 2019
A: Please see Addendum No. 2.
0

11.
Q: Will the steel piles require shoes?
June 14, 2019
A: No, steel pile shoes are not required.
0

(Name of user and company posting question is not visible to other bidders)

SELF-REGISTERED PLAN HOLDERS

GENERAL CONTRACTORS

Pacific Pile & Marine, LP
Pacific Pile & Marine, LP
Katie Laborde
katiel@pacificpile.com
O: 206-331-3873
F:

Contact: Katie Laborde
Email: katiel@pacificpile.com
700 South Riverside Drive, Seattle, WA 98108
O (206) 331-3873

Legacy Contracting Inc.
Legacy Contracting Inc.
Chris Rau
bids@legacycontractinginc.com
O: 503-749-1818
F: 888-249-2203

Contact: Chris Rau
Email: bids@legacycontractinginc.com
41850 Kingston-Jordan Rd., Stayton, OR 97383
O (503) 749-1818 F (888) 249-2203
SUBCONTRACTORS

Service Electric Co. Inc.
Service Electric Co. Inc.
Ken Land
ken@secoinc.com
O: 360-568-6966
F: 360-568-9283

Contact: Ken Land
Email: ken@secoinc.com
P.O. Box 1489 , Snohomish, WA 98291
O (360) 568-6966 F (360) 568-9283

AMO Construction
AMO Construction
Bryan White
amoconstruction@comcast.net
O: 360-779-5113
F:

Contact: Bryan White
Email: amoconstruction@comcast.net
1742 NE Jacobson RD, Poulsbo , WA 98370
O (360) 779-5113
SUPPLIERS
PROFESSIONAL SERVICES

CORROSION Mitigation
CORROSION Mitigation
stuart ell
goda4974@gmail.com
O: 425-308-2394
F:

Contact: stuart ell
Email: goda4974@gmail.com
7023 76th dr ne, marysville, WA 98270
O (425) 308-2394
PLAN CENTERS

PRINT & COPY SERVICES

Please register as a plan holder to display any available print centers in your area.